Odd jobs day

Finally got back to the ongoing job of washing the outside of the trailer, after nearly 4 weeks the job is about 85% complete! (why do today what you put off until tomorrow). Lyn gave the inside a clean and finished off the laundry.

In the process of removing the laundry basket from the storage area Lyn discovered that the flooring was wet. After emptying out the storage area and removing the protection around the water pump it became obvious that there was no obvious leak! Left the access doors open all day, and it dried out. Played around with running the water, but still no leak. Took the opportunity to move the pump a few inches to increase the storage area, we’ll see what happens tomorrow, it may just be a humidity thing.

This entry was posted in 2010, Georgia, Trips, Week 5. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *