Partial Connectivity

After a day and a half the internet seems to be back, and more stable. Just in time for us to leave!!

A couple of days of warm weather spent mostly at the campsite. Yesterday Lyn treated herself toan expensive and exclusive haircut!

Today it was time to get one of the gas tanks filled, and change the water filter on the trailer. After lunch we went about a mile down the road and took a walk along the Withlacooche Trail. This is an old railway line that has had the rails removed and then a road surface laid, the whole trail is 46 miles long. There seems to be a movement in Florida called Rails to Trails so there are probably more of these around the state.

This entry was posted in 2011, Beverly Hills, Florida, Trips, Week 4. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *